Welcome to visit us!

[email protected]
logo logo

Sand Wash Irrigation Company Roosevelt Ut

Plant yates, cooling system replacement.Designed and built large pipe carriers, pipe support system, field installation welding 240 pieces of 60 through 102 dia.Steel cooling system tunnel pipe, including 60 field fabricated connections to the tunnel ranging 6 to 60 in diameter.

Copyright© 2020 FUMINE machinery all rights reserved.Sitemap