Welcome to visit us!

[email protected]
logo logo

Construction Of Ball Mill Foundations

Hire an experienced design and build contactor that has a proven track record with precision machine tool foundations.If the foundation is a below floor design with a metal surround deck make sure to leave a sufficient gap between the deck and the machine base.They should never touch as this can cause problems with leveling and alignment.

Copyright© 2020 FUMINE machinery all rights reserved.Sitemap