Welcome to visit us!

[email protected]
logo logo

Ore Processing Plant Kingman Az

The mineral park molybdenum deposit is a surface mining operation.Initial production took place in 1965.Mine operations consist of surface workings extending 900.00 hectares 2,223.95 acres.There is one known shaft.The mining method is bench berm.Mine capacity in 1978 was 17230 mt oreday with a production unit cost of 2 mt ore.

Copyright© 2020 FUMINE machinery all rights reserved.Sitemap