Welcome to visit us!

[email protected]
logo logo

Trapezoidal Mill Safety Operation Procedures

Pipeline maintenance section page | 6 1.Preliminary work and safety measure 1.Place the test section in trench 2.Anchor the pipe section and fill up the pipe with water.3.Area to be cordoned off and display caution sign board.4.Place pressure pump above trench at least 5m away from the pipe section being tested.5.

Copyright© 2020 FUMINE machinery all rights reserved.Sitemap