Welcome to visit us!

[email protected]
logo logo

Mine Main Transport Belt

When the arch western coal skyline mine decided to replace the old belt of its long distance bc-8 pipe conveyor, a new belt had to be designed to be suitable to the existing routing.In addition, a special installation procedure had to be developed to minimise downtime during the belt.

Copyright© 2020 FUMINE machinery all rights reserved.Sitemap